Showing posts with label coking/delayed coking butyl-octyl alcohol. Show all posts
Showing posts with label coking/delayed coking butyl-octyl alcohol. Show all posts

Monday, July 1, 2013

coking/delayed coking butyl-octyl alcohol pressure vessel tower manufacturing

Delayed coking unit consists of eight components: (1) coking, mainly equipment is furmace and coke towers. it contains single furnace double towers, two furnace four towers, also have a direct jointly with other devices. (2) fractionation, mainly equipment is fractionator. (3) coking gas recovery and desulfurization, mainly equipment is absorb desorption tower, stabilizer tower , Reabsorption Tower etc. (4) hydraulic coke. (5) coke dehydration and storage. (6) blow-off and venting system. (7) steam-generating  (8) coke roasting . the furnace outlet temperature is set to 495-500 ℃, coke tower pressure is set to 0.15-0.2 Mpa.


Low carbon hydroxyl synthetic core technology is adopted in rhodium catalysts, thus the reaction pressure is reduced greatly. Therefore, the factory investment and maintenance cost is low, propylene generating butanol of high selectivity, reaction velocity is fast, product yield is high, raw material consumption is little, catalyst is little, easy operation, corrosive small, less contamination of environment (nearly harmless technology). Therefore, this method of production worldwide with distinct advantage and rapid development, it is the main methodes of  butyl alcohol and octyl alcohol now.

benzole scrubber and ammonia distillation tower

butyl alcohol by gas hydrogenation evaporator tower and octyl alcohol by gas hydrogenation evaporator tower

ammonia-containing coking wastewater  processing system process schematic
Loading tower for shipping
                


                        

coking/delayed coking butyl-octyl alcohol factory